수행실적
Supply Date | Contract | Project Name | Description |
---|---|---|---|
2017.01 | 현대중공업 | IRAQ ZUBAIR PJT | E-HOUSE |
2016.09 | SCHNEIDER ELECTRIC | GCR PTEQP E-HOUSE PJT(HWASUNG DONGTAN) | E-HOUSE |
2016.08 | HONEYWELL | UZBEKISTAN KANDYM PJT | FAR & HVAC SYSTEM |
2016.05 | 삼성엔지니어링 | IRAQ ENI ZUBAIR PJT | FAR & HVAC SYSTEM |
2016.05 | 현대중공업 | QATAR UAH 16MW DPP | EGCP / LECP REMOTE IO PANEL |
2015.12 | INVENSYS PROCESS SYSTEMS | KOC TELEMETRY PJT | FAR & HVAC SYSTEM |
2015.09 | 현대중공업 | T2-2 16MW GPP | ENGINE/GENERATOR CONTROL PANEL CONTROL & MONITORING SYSTEM ECS POWER SUPPLY CONVERTER PANEL |
2015.09 | 현대중공업 | T2-3 28MW GPP | NGR PANEL |
2015.09 | 현대중공업 | NEW YORK 10MW GPP | ENGINE/GENERATOR CONTRAL PANEL |
2015.09 | 현대중공업 | KAR3 8.5MW PPS | CONTROL PANELS |
2015.08 | 효성 | EGYPT ERC REFINERY PJT | GCP, MCC, NGR W/CONTAINER |
2015.05 | 콘웰 | Saudi Arabia MA’ADEN GOLD PJT | FAR & HVAC System |
2015.05 | 현대중공업 | PHILIPPINES SURENCO 10.9MW DPP | CONTROL & MONITORING SYSTEM ENG/GEN CONTROL PANEL, LOCAL ENGINE CONTROL PANEL |
2015.02 | 현대중공업 | VENEZUELA 204MW PPS | CONTROL PANELS |
2015.02 | 현대중공업 | TORGINOL PAINT 1.1MW PPS | CONTROL PANELS |
2014.10 | 현대중공업 | SUPREME 11MW PPS | CONTROL PANELS |
2014.10 | 한국 에머슨 프로세스매니지먼트 | Nigeria GBU PJT/Shell | FAR & HVAC System |
2014.09 | 현대중공업 | IRAQ WQ2 CPPB PJT | E-HOUSE |
2014.07 | 현대중공업 | LIBERIA LEC 10MW DPP | EGCP, LECP & COMMON SYNCHRO PANEL |
2014.06 | 현대중공업 | EGE HAINA 1.7MW PPS | ELECTRIC UNIT & EGCP |